MIL-R-52453C(ME)
5. PACKAGING
5.1 Preservation, packing and marking. Each complete roller shall be preserved, packed, and marked in accordance with MIL-R-3075. The level of preservation shall be level A, B, or commercial and the level of packing shall be level A, B, or commercial as specified (see 6.2).
6. NOTES.
6.1 Intended use. The roller is intended for use in compacting granular soils.
6.2 Ordering data. Procurement documents should specify the following:
a. Title, number and date of specification.
b. Date of issue of DoDISS applicable to this contract and exceptions thereto (see 2.1.1). c. When first article inspection is not required (see 3.2).
d. Time frame for submission of first article roller and number of rollers required
(see 3.2).
e. When the Government will conduct any or all of the first article examination and tests. When the Government will conduct some but not all of the first article examination and tests, the contracting officer should specify which examination and tests will be conducted by the Government and which examination and tests shall be conducted by the contractor (see 3.2).
f. When preproduction roller inspection is not required (see 3.2).
g. When initial production roller inspection is required and number of rollers to be furnished (see 3.2).
h. When sound measurement tests are not required (see 3.9).
i. When electromagnetic interference requirements are other than as specified in 3.20.
J. When fungus and moisture resistance is not required (see 3.21). k. When the finishing coat shall be other than as specified in 3.24.
l. Degree of preservation and degree of packing required (see 5.1).
6.3 First article. Any changes or deviation of production rollers from the approved first article during production will be subJect to the approval of the contracting officer. Approval of the first article will not relieve the contractor of his obligation to furnish rollers conforming to this specification.
6.4 Data requirements. The contracting officer should include requirements for such data as technical publication, instructional materials, illustrated parts lists, and contractors maintenance and operation manual to be furnished with each roller.
6.5 Provisioning. The contracting officer should include provisioning requirements for repair parts and maintenance tools as necessary (including any special tools), and instructions on shipment of rollers.