MIL-P-29196B(YD)
The first article should consist of one unit (see 2.2). The contracting officer
should include specific instructions in acquisition documents regarding
arrangements for examination, test, and approval of the first article.
* 6.5 Subject term (key word) listing.
Engine
Hydraulic
Material spreading
Receiver hopper
Vibrating heated screed
* 6.6 Changes from previous issue. The margins of this specification are
marked with an asterisk to indicate where changes (additions, modifications,
corrections, deletions) from the previous issue were made. This was done as a
convenience only and the Government assumes no liability whatsoever for any
inaccuracies in these notations. Bidders and contractors are cautioned to
evaluate. the requirements of this document based on the entire content
irrespective of the marginal notations and relationship to the last previous
issue.
* 6.7 Subject term (key word) listing
Bottom fired
Burner
Kerosene fueled
Melting tank
Tube fired
Custodian:
Preparing Activity:
Navy - YD
Navy - YD
(Project 3895-N316)
1--
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business